Transamerica Pyramid
San Francisco, CA
Taylor Engineers was brought onto the Transamerica lobby and amenities project in 2020 and have since become the building design engineer, completing nearly 20 floors of tenant improvement projects. The building was repositioned with a significant investment, including a major renovation of the 1st level of parking, lobby, three amenity floors, annex space, and a top-floor bar and event space. Taylor Engineers was brought in to provide creative and well-executed solutions to an ambitious architectural design by Foster + Partners in the iconic existing building.
The lobby was transformed and is now served by radiant heating and cooling in a new topping slab. The annex space (currently used as a gallery) was completely redone. Thermal comfort modeling was performed to understand how to best mitigate the solar impact of the existing glass roof. Amenities spaces included a gym, spa, leasing gallery, and locker rooms.
Taylor Engineers has also provided multiple central plant analyses and recommendations for base building system upgrades, including potential electrification. The building is currently served by a co-generation plant that provides electrical demand charge reduction and heating hot water for the building.
Size (ft²)
300,000
Stories
48
Project Type
Commercial
Scope of Work
Design of MEPS systems and control systems for major core building upgrades and various tenant improvements.
Completed
2025
Owner
SHVO
Architect
Foster + Partners, Huntsman Architectural Group
Contractors
Hathaway Dinwiddie
Photographer
References
Nova Partners: Amine Chaoui
Foster + Partners: Simone Martin
Hathaway: Troy McKinley